mindstair

Home / Courses / Managerial Accounting / Unit 8

Managerial Accounting Unit 8: Standard Costs and Variance Analysis

Standard costs set benchmarks for what inputs should cost, and variances measure how actual results differ. This unit teaches the flexible budget and every core variance formula.

Covers: Setting ideal and practical standards, Flexible budgets and activity vs. spending variances, Materials price and quantity variances, Labor rate and efficiency variances, Variable overhead spending and efficiency variances, Fixed overhead budget and volume variances, Management by exception and variance causes

Study guide

A standard cost is a carefully set benchmark for one unit of input or output, such as 3 pounds of material at $5 per pound. Ideal standards assume perfect efficiency and are rarely met, which can discourage workers; practical standards allow for normal waste, breaks and downtime and are tight but attainable. Standards are combined on a standard cost card showing the standard quantity and price for each input. Differences between actual and standard costs are variances. A variance is favorable (F) when actual cost is below standard and unfavorable (U) when above. Managers use management by exception, investigating only significant variances.

Before computing cost variances, compare actual results with a flexible budget, which restates the budget at the actual level of activity using cost formulas. The static budget is for the planned level only. The difference between the flexible and static budgets is the activity (volume) variance, caused only by the change in volume. The difference between actual results and the flexible budget is the spending or flexible budget variance, caused by prices and efficiency. Comparing actual costs directly with a static budget is misleading when activity changes, because higher volume naturally raises variable costs.

Direct materials and direct labor variances use one general model. A price variance = actual quantity × (actual price - standard price), and a quantity variance = standard price × (actual quantity - standard quantity allowed for actual output). For materials these are the materials price and quantity variances; for labor, the labor rate variance = AH × (AR - SR) and the labor efficiency variance = SR × (AH - SH). If materials purchased differ from materials used, the price variance uses the quantity purchased and the quantity variance uses the quantity used. Purchasing managers usually answer for price variances, while production supervisors answer for quantity and efficiency variances.

Variable overhead follows the same model. The spending variance = actual VOH - (AH × standard rate), and the efficiency variance = standard rate × (AH - SH). The VOH efficiency variance really measures efficient use of the allocation base, such as labor-hours, not of overhead itself. Fixed overhead is different because it does not change with activity. The budget variance = actual fixed OH - budgeted fixed OH, and the volume variance = budgeted fixed OH - applied fixed OH, where applied = fixed rate × standard hours allowed. The volume variance reflects using more or less capacity than the denominator level, not spending. Variances interact, so cheaper materials may cause extra waste.

Key ideas

Formulas and rules

Materials price variance = AQ × (AP - SP); Materials quantity variance = SP × (AQ - SQ)
Labor rate variance = AH × (AR - SR); Labor efficiency variance = SR × (AH - SH)
VOH spending variance = Actual VOH - (AH × SR); VOH efficiency variance = SR × (AH - SH)
Fixed OH budget variance = Actual fixed OH - Budgeted fixed OH
Fixed OH volume variance = Budgeted fixed OH - (Fixed OH rate × SH allowed)
Flexible budget cost = Fixed cost + Variable rate × Actual activity

Common mistakes

Before the test, make sure you can

Words to know

Standard cost
A benchmark cost for one unit of an input or output under expected conditions.
Ideal standard
A standard assuming perfect efficiency with no waste, breakdowns or idle time.
Practical standard
A standard that is tight but attainable, allowing for normal waste and downtime.
Standard cost card
A record listing the standard quantity and price of each input for one unit.
Standard quantity allowed
Standard quantity per unit times the actual number of units produced.
Static budget
A budget prepared for one planned level of activity.
Flexible budget
A budget adjusted to the actual level of activity using cost formulas.
Activity variance
The difference between the flexible budget and the static budget, caused by volume.
Spending variance
The difference between actual results and the flexible budget.
Materials price variance
AQ × (AP - SP): the effect of paying a different price for materials.
Materials quantity variance
SP × (AQ - SQ): the effect of using more or less material than allowed.
Labor rate variance
AH × (AR - SR): the effect of paying a different wage rate.
Labor efficiency variance
SR × (AH - SH): the effect of using more or fewer labor-hours than allowed.
Variable overhead efficiency variance
SR × (AH - SH) for overhead; measures efficient use of the allocation base.
Fixed overhead volume variance
Budgeted fixed overhead minus applied fixed overhead; reflects capacity use.
Denominator activity
The activity level used to compute the predetermined fixed overhead rate.
Management by exception
Focusing attention on significant variances rather than all deviations.

Sample practice questions

30 more questions like these, from level 1 to 5, are in the practice set.

Question 1 (level 1)

The materials price variance is calculated as:

  1. Standard price × (Actual quantity - Standard quantity allowed)
  2. Standard quantity allowed × (Actual price - Standard price)
  3. Actual price × (Actual quantity - Standard quantity allowed)
  4. Actual quantity purchased × (Actual price - Standard price)
Show the answer and steps

Answer: D) Actual quantity purchased × (Actual price - Standard price)

  1. Price variances isolate the effect of paying a different price.
  2. They multiply the price difference by the actual quantity purchased.
  3. Standard price × quantity difference is the quantity variance.
Question 2 (level 1)

A practical standard is one that:

  1. Assumes perfect efficiency with no waste or downtime
  2. Allows for normal breaks, machine downtime and some waste
  3. Is set after the period based on actual results
  4. Is used only for external financial reporting
Show the answer and steps

Answer: B) Allows for normal breaks, machine downtime and some waste

  1. Ideal standards assume perfect conditions and are rarely met.
  2. Practical standards are tight but attainable with reasonable effort.
  3. Most experts recommend practical standards because they motivate workers.
Question 3 (level 3)

A company purchased 8,000 pounds of material at $3.10 per pound but used only 7,400 pounds. The standard price is $3.25. If the price variance is computed at purchase, what is it?

  1. $1,200 U
  2. $1,110 U
  3. $1,110 F
  4. $1,200 F
Show the answer and steps

Answer: D) $1,200 F

  1. When computed at purchase, the price variance uses the quantity purchased.
  2. 8,000 × ($3.10 - $3.25) = 8,000 × -$0.15 = -$1,200.
  3. Paying less than standard is favorable. Using pounds used is the trap.